Custom Tile Work in Knoxville, TN
Tile does not forgive shortcuts. A floor that is not level shows in the grout lines, and a shower that is not sloped and sealed correctly fails behind the wall, where you will not see it until it is expensive. We set tile the way it is supposed to be done: level, tight, and properly waterproofed.
What this includes
- Shower and tub surrounds
- Bathroom and kitchen floors
- Kitchen backsplashes
- Tile repair and regrouting
- Waterproofing and correct slope for showers
- Natural stone, porcelain, and ceramic
Why Top Knox
Jeremiah has set tile for more than 25 years, and most of the tile repairs that come to us failed because of what is behind the tile, not the tile itself: bad waterproofing, no slope, or the wrong substrate. We get that part right the first time.
Backed by our guarantee
This work is covered by our one-year workmanship guarantee . Read the full terms.













How long does a shower retile take?
A full shower surround typically takes several days once demolition starts, including time for waterproofing to cure properly before tile goes up. Rushing that step is exactly how showers end up leaking behind the wall.
Can you match my existing tile for a repair?
Often, yes, though older tile lines are sometimes discontinued. We will tell you during the estimate whether a match is realistic or whether a small pattern change makes more sense.
Serving Knoxville and communities within about an hour's drive. See the full service area.